Valencia Nutrition Expands Manufacturing Footprint with Inauguration of VBSW Unit II in Hyderabad

Hyderabad, Jan 16: Valencia Nutrition Limited (VNL) today inaugurated Unit II of its integrated beverage manufacturing facility under its subsidiary, Valencia Beverages and Super water (VBSW), in Hyderabad. The facility was inaugurated by Mr. Manish Turakhia, Visionary Promoter and Managing Director of Valencia Nutrition Limited.

VBSW Unit I and Unit II were developed by the company’s in-house engineering team, led by Mr. Jay Shah, Executive Director of VBSW, and John P. Michael, Director of VBSW. The commissioning of Unit II marks a significant milestone in VBSW’s roadmap to 27 plants, strengthening its decentralized manufacturing strategy for the mass-market PET bottle range sold under the flagship brand Bounce Super drinks and category brands such as Vitafizz, Pulpify, and Powerplay.

As part of the inauguration, VNL announced that Bounce Vitafizz will now be available in a new packaging format. Designed for affordability and wider reach, this new format supports the company’s focus on high-volume distribution.

The VBSW Unit II facility, spanning 49,700 sq. ft., is the largest juice-line manufacturing facility in Telangana and houses India’s first hybrid hot-fill juice-line manufacturing system. This integrated line enables the production of juices, fruit-based drinks, pulp beverages, nata-de beverages, and soda variants. The unit has a production capacity of 300,000 bottles per day and is equipped with a 120,000-liter-per-day RO water system, high-speed PET bottling lines, and IoT-enabled production monitoring for real-time operational visibility.

The facility was fully commissioned within three months (October 15, 2025, to January 14, 2026), achieving regulatory compliance within two months. Notably, Unit II was established at approximately 60% of typical market costs, reflecting VNL’s execution efficiency.

Commenting on the development, Mr. Manish Turakhia, Promoter and Managing Director of VNL, said: “Well-planned machinery layout, execution speed, and efficient local approvals are critical to setting up complicated plants. This facility reflects our approach to building efficient, compliant, and future-ready infrastructure. Achieving effective plant utilization through ‘majority sales at factory gate’ is essential for faster ROI. I take pride in Team Valencia’s management of the installation of over 107 tonnes of machinery and pipelines.”

Leave a Reply

Your email address will not be published. Required fields are marked *